• Open Daily: 10am - 10pm
    Alley-side Pickup: 10am - 7pm

    3038 Hennepin Ave Minneapolis, MN
    612-822-4611

Open Daily: 10am - 10pm | Alley-side Pickup: 10am - 7pm
3038 Hennepin Ave Minneapolis, MN
612-822-4611
Modeling Structure Removal Processes in the Gulf of Mexico

Modeling Structure Removal Processes in the Gulf of Mexico

Paperback

General Science

ISBN10: 1514672499
ISBN13: 9781514672495
Publisher: Createspace
Published: Jun 23 2015
Pages: 150
Weight: 0.80
Height: 0.32 Width: 8.50 Depth: 11.02
Language: English
At the end of 2003, there were nearly 4,000 structures in the federal waters of the Gulf of Mexico (GOM) associated with hydrocarbon production: 2,175 active (producing) structures, 1,227 idle (non-producing) structures, and 505 auxiliary (never-producing) structures. Since 1947, when production in the GOM first began, over 2,200 structures have been removed from federal waters, and over the past decade, 125 structures on average have been removed annually. The purpose of this report is to describe the operational aspects of removal processes in the GOM and to develop a production-based model to forecast the removal of offshore structures.

Also in

General Science